 DB Plumbing & Heating is a reputable installation business owned by Darran Bartolo who has over 11 years experience in project management and installation of Plumbing, Heating and Bathrooms. From survey to design to installation to after sales Darran puts his efforts in making sure that the journey for all clients is a pleasant and rewarding experience.

 

Here is an example of one of the projects installed by DB Plumbing & Heating from start to the finished article

 

Step 1 The client contacts us and we arrange a suitable date and time for a no obligation survey
Step 2 We visit the client's property, discuss the client's home improvement project they wish to have installed. Carry out a survey of the work required. Take all necessary notes including measurements and pass them to our business partner, Concepts Scotland Limited who offer us a 3D design and presentation available to all our clients.
Step 3 The design of all projects are carried out using 3D software to illustrate the proposed installation. At this point we can alter the design until the client is satisfied ( this process can take a few attempts)
Step 4 Prepare the final specification according to the products selected by the client and after our designer confirms that the products selected are appropriate to fit the final design layout. 
Step 5 Discuss the specification and prices with the client with a view to closing the deal. At this point the client pays a deposit and the internal administration procedure commences.
Step 6 Once the contract is signed and the deposit received from the client, we place all orders for the specified products and issue a letter or send an e-mail to the client to indicate the date of commencement of work. The date at this stage is an approximate date as we always have to receive all the products before work commences
Step 7 Once all the products are received we contact the client again to arrange for access to commencement work
Step 8 All work is project managed by Darran Bartolo during the duration of the contract. On completion Darran checks off the installation and makes sure that all is to the client's satisfaction
This example project was awarded to our company by Concepts Scotland Limited. The clients requested that their small shower be converted to a large walk-in shower To achieve this we had to remove the Hall cupboard, re-site the hot water cylinder which was installed within the cupboard and re-plumb the hot water system The first job was to remove the existing suite and expose all walls to allow for a full re-plumb of the bathroom including removing the cupboard. Install first fix plumbing, wastes and electrics.  Instal the shower first fix part. Test all first fix work and instal new moisture resistant plasterboard. The shower tray is installed and tiling work can commence and completed.
 
On completion of tiling all products are installed (second fix). The result is extremely comfortable for the client as in this particular case the large desired shower area is achieved complimented with some excellent Tiling design To achieve the design, the basin is re-sited, the radiator is re-sited and the WC is re-sited. New products are installed to suit the design. The finished article is our pride and more important is the positive reaction from the client.  Designs are all carried out using Logicom Virtual World 3D software

 

 

 Designs at Concepts Scotland Ltd. are carried out by using Logicom Virtual World 3D software.

 

Here is an example of one of our projects showing the computer 3D drawings and photos of the finished job taken on completion of work. The result is very similar to the 3D drawings making our design service a true image of what the client can expect.

 

Top view of our 3D design showing the client the kitchen layout as per their amendments and our recommendations which we agreed after a few attempts at the overall layout Above is our 3D visual of the Hob and sink area. Below is the photo of the same area of the kitchen which we took once the job was complete Above is our 3D visual of the built-under fridge and built-under freezer both concealed to create one piece of furniture. Below is the photo of the same area of the kitchen which we took once the job was complete